Service Manual — page 46 of 715
Periodic Maintenance › Evaporative Emission Control System Inspection (Other than US, CA, ID and SEA-B2 Models)
Text on this page
2-24 PERIODIC MAINTENANCE
Periodic Maintenance Procedures
Evaporative Emission Control System Inspection
(Other than US, CA, ID and SEA-B2 Models)
•○Inspect the canister as follows.
Remove the meter cover (see Meter Cover Removal in
the Frame chapter).
○Slide the clamps [A].
○Disconnect the hoses [B].
○Remove:
Band [C]
Canister [D]
○Visually inspect the canister for cracks or other damage.
If the canister has any cracks or bad damage, replace it
with a new one.
NOTE
○The canister is designed to work well through the motor-
cycle’s life without any maintenance if it is used under
normal conditions.
• Inspect the purge valve (see Purge Valve Operation In-
spection in the Fuel System (DFI) chapter).
○Check that the hoses are securely connected and clips
are in position.
○Replace any kinked, deteriorated or damaged hoses.
○Run the hoses according to Cable, Wire, and Hose Rout-
ing section in the Appendix chapter.
○When installing the hoses, avoid sharp bending, kinking,
flattening or twisting, and run the hoses with a minimum of
bending so that the emission flow will not be obstructed.