Service Manual (KLZ1000C) — page 466 of 762
Frame › Upper Fairing Bracket Installation
Text on this page
15-22 FRAME
Fairings
Upper Fairing Bracket Installation
• Installation is the reverse of removal.
• Run the leads correctly (see Cable, Wire, and Hose Rout-
ing section (18-2)).
• Tighten:
Torque - Upper Fairing Bracket Bolts (M8): 25 N·m (2.5
kgf·m, 18 ft·lb)